Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Excavations.ie

2022:913 - Dublin Port MP2 Project, Capital Dredging, Season 1; Berth 52/53, and Northern/Southern Widening Areas, Inner Channel Slopes, Dublin Port, Dublin, Dublin

NMI Burial Excavation Records

County: Dublin

Site name: Dublin Port MP2 Project, Capital Dredging, Season 1; Berth 52/53, and Northern/Southern Widening Areas, Inner Channel Slopes, Dublin Port, Dublin

Sites and Monuments Record No.: N/A

Licence number: 23E0892, 23D0107, 23R0469

Author: Rex Bangerter, ADCO

Site type: Seabed

Period/Dating: Modern (AD 1750-AD 2000)

ITM: E 720752m, N 734281m

Latitude, Longitude (decimal degrees): 53.344956, -6.186518

Missing Mapbox GL JS CSS

The MP2 project is the second major infrastructure development within the Port Estate and forms part of Dublin Port’s Masterplan 2012-2040. The MP2 Project complements the preceding Alexandra Basin Redevelopment (ABR) project, providing capacity for growth in the Ro-Ro Lo-Lo modes (located on the north side and eastern end of the Port Estate), while providing suitable infrastructure for increasing numbers of ferry passengers. As part of the MP2 project, dredging was required on both the north and south sides of the Navigation Channel, as follows:

  1. Dredging of Berth 52 to a depth of -3m CD, west side of Northern Widening Area (NWA).
  2. Dredging of Berth 53 and associated channel widening (NWA) to a depth of -10.0m CD.
  3. Dredging of the Southern Widening Area (SWA) to a depth of -10m CD.

The dredging company appointed by Dublin Port Company was Van Oord, operating the backhoe dredger Razende Bol and the trailing suction hopper dredger (TSHD) Costa la Luz. Backhoe dredging was completed over a 52-day period, commencing 15 October 2022, and the TSHD was in operation for 23 days, commencing 2 November 2022.

Backhoe dredging was employed at Berth 52, dredging to a design depth -3m CD, and also facilitated the removal of upper seabed levels at Berth 53/Northern Widening Area (NWA) and across the Southern Widening Area (SWA), dredging to a maximum depth of -6m CD. TSHD operations removed the remaining (deeper) deposits, dredging to a design depth of -10m CD. NWA centrepoint coordinate ITM 720752E, 734281N and SWA centrepoint coordinate ITM 721037E, 733997N.

All dredging operations were subject to archaeological monitoring by ADCO; a single archaeologist being present on each 12-hour dredge cycle (per vessel) in the 24hr operation.

Unlike previous dredge campaigns, completed as part of the ABR project (Capital Dredge Season 1-4; 17E0506, 17E0506 Ext.), which recovered significant quantities of ship’s timbers and other maritime related finds, only six (isolated) finds were encountered  as part of the MP2 monitoring (Finds 22E0401:01-22E0401:06). One find was recovered as part the Backhoe dredging undertaken across the NWA, the remaining five being recovered from TSHD operations: DT085 (SWA), DT94 (NWA), DT133 (NWA), DT139 (NWA), and DT179 (NWA). All items, apart from Find 01, appear to be of twentieth-century date or later, and include the following:

  • Find 01, Kedge Anchor, admiralty folding type anchor, also known as a ‘Fisherman’s anchor’, commonly used in 1800’s.
  • Find 02, Quayside timber
  • Find 03, Steel pin (large, early-mid twentieth-century date); square-profile, with a forged bend/head.
  • Find 04, Rubbing strake from the timber hull of a mid-twentieth-century boat.
  • Find 05, keel piece (800mm length) or sternpost with two (2) keelson holes, small copper nails and some in situ
  • Find 06, Timber (probable fender).

Frequent modern material was encountered also, with one-hundred and thirteen (113) items recovered from Berth 53/ Northern Widening Area and twenty-five (25) from the SWA.

Excavation, Dive Survey, and Detection Device Licences were in place for the duration of the archaeological monitoring; DHLGH Licence numbers 23E0892, 23D0107, 23R0469.

Read More