County: Cork Site name: Ballydahin, Mallow, River Blackwater
Sites and Monuments Record No.: CO033-094---- Licence number: 18E0123
Author: Julianna O'Donoghue, Mizen Archaeology
Site type: No archaeological significance
Period/Dating: —
ITM: E 556138m, N 598056m
Latitude, Longitude (decimal degrees): 52.132628, -8.640675
A wading and a dive survey of the deeper parts of a new pipeline across the Blackwater River to the east of Mallow Bridge was undertaken as part of the Mallow Sewerage Network Upgrade. An area of the river encompassing the site of the proposed works and measuring c. 100m by 30m was subject to an underwater visual and metal detection survey. 100% coverage of the study area was achieved using transepts at 1m intervals. No archaeology was found.
The Forge, Innishannon, Co. Cork